Services / Pool digs

Pool digs

Digging to the dimensions in the plans, with a levelled bottom and working room for formwork. The soil is hauled away or piled on the property.

Machine

mini excavator or backhoe loader

Typical depth

150–250 cm

Typical time

one to three days

How it's done

First we work out the volume, because the number of dump truck loads depends on it — that's usually half the job. We dig about half a meter beyond the outside dimensions to leave room for formwork and waterproofing. The bottom is checked with a level against the elevation in the plans.

When we say no

If the yard has no way out for a dump truck, the soil goes out by wheelbarrow and the price multiplies. We tell you that at the site visit, not after you've paid for plans.

What to know afterward

An open excavation collects water. If more than a week passes between digging and formwork, plan to cover it.

Also known as

pool excavation, swimming pool dig, pool hole, pool site prep

Will the machine fit?

98 cm · mini excavator

The mini excavator is 98 cm wide. Measure the entrance at its narrowest point — between the posts, not between the gate leaves.

More services

The site visit is free and takes twenty minutes

Tell us what needs digging and how wide the entrance is. If you send a photo of the yard too, we can tell you over the phone whether the machine fits.